少妇野外一级内射婬片免费放,爆乳无码av一区二区三区,麻豆国产精品无码视频欧美变态另类残忍视频,久久久久精品久久久久影院蜜桃,少妇被又大又粗又爽毛片黑人无码乱码av天堂一区二区,久久ri精品高清一区二区三区,人妻洗澡被强公日日澡,日日躁夜夜躁夜夜揉揉

大連注塑成型
Your current location : Home >>  news >> Technical support

Contact UsContact Us

Dalian Jinghe Molding Co., Ltd

Dalian Chenghua plastic products Co., Ltd

Tel:0411-87840676

Fax:0411-87840576

Web:www.ganaelle.com/en

E-mail:office@dlchenghua.cn

              office@dljinghe.com

Add:No. 343, Jinwan Road, Zhanqian Street (Majia New Village), Jinzhou District, Dalian

Problems in injection molding

release date:2021-06-22 00:00 source: http://www.ganaelle.com Click:

The pressure in the injection molding process includes plasticizing pressure and injection pressure, which directly affects the plasticization of plastics and the quality of products.


1. Plasticizing pressure:


(back pressure) when the screw injection machine is used, the pressure on the molten material at the top of the screw when the screw rotates and retreats is called plasticizing pressure, also known as back pressure. This pressure can be adjusted by the overflow valve in the hydraulic system.


In injection, the plasticizing pressure needs to change with the screw design, product quality requirements and different types of plastics. If these conditions and the screw speed remain unchanged, increasing the plasticizing pressure will strengthen the shear effect, that is, it will increase the melt temperature, but it will reduce the plasticizing efficiency, increase the countercurrent and leakage flow and increase the driving power.


In addition, increasing the plasticizing pressure can often make the temperature of the melt uniform, the color mixture uniform and discharge the gas in the melt. In general, in operation, the plasticizing pressure should be determined as low as possible on the premise of ensuring good product quality. The specific value varies with the variety of plastics used, but it usually rarely exceeds 20 kg / cm2.


2. Injection pressure:


In the current production, the injection pressure of almost all injection machines is based on the top of the plunger or screw to the plastic


The applied pressure (converted from oil circuit pressure) shall prevail. The role of injection pressure in injection molding is to overcome the flow resistance of plastic from the barrel to the cavity, give the melt filling rate and compact the melt.


The time required to complete an injection molding process is called molding cycle, also known as molding cycle. It actually includes the following parts:


Molding cycle: the molding cycle directly affects labor productivity and equipment utilization. Therefore, in the production process, the relevant time in the forming cycle should be shortened as far as possible on the premise of ensuring the quality. In the whole molding cycle, injection time and cooling time are the most important, which have a decisive impact on the quality of products.


The mold filling time in the injection time is directly inversely proportional to the mold filling rate, and the mold filling time in production is generally about 3-5 seconds. The pressure holding time in the injection time is the pressure time on the plastic in the mold cavity, which accounts for a large proportion in the whole injection time, generally about 20-120 seconds (for extra thick parts, it can be as high as 5-10 minutes).


Before the molten material at the gate is frozen, the holding time has an impact on the dimensional accuracy of the product. If it is later, it has no impact. Pressure holding time also has a favorable value. It is known that it depends on material temperature, mold temperature and the size of sprue and gate. If the size and process conditions of sprue and gate are normal, the pressure value with the smallest fluctuation range of product shrinkage shall prevail.


The cooling time mainly depends on the thickness of the product, the thermal and crystallization properties of the plastic, and the mold temperature. The end point of the cooling time shall be based on the principle of ensuring that the product will not change during demoulding. The cooling time is generally about 30 ~ 120 seconds. It is unnecessary to have a long cooling time, which will not only reduce the production efficiency, but also cause demoulding difficulties for complex parts, and even produce demoulding stress during forced demoulding. The other time in the forming cycle is related to the continuity and automation of the production process and the degree of continuity and automation.


Dalian injection molding


Related tags: Dalianinjectionmolding

  • Add:No. 343, Jinwan Road, Zhanqian Street (Majia New Village), Jinzhou District, Dalian
    Add:No. 343, Jinwan Road, Zhanqian Street (Majia New Village), Jinzhou District, Dalian
  • E-mail:office@dlchenghua.cn
    E-mail:office@dlchenghua.cn
  • Tel:0411-87840676
    Tel:0411-87840676
Professional production enterprise engaged in plastic injection molding, extrusion and blow molding

1637907000586125.png

Wechat        Mobile

Dalian Chenghua plastic products Co., Ltd

Dalian Jinghe Molding Co., Ltd

亚洲午夜激情视频| 欧美日韩国产免费一区二区三区| 最新久久国产亚洲高清观看| 日韩精品无码人妻一区二区三区| 亚洲AV日韩AV无码另类小说久| 日韩欧美在线第一页| 亚洲性色AV日韩在线观看| 国产精品国产三级国快看| 国产成人影院一区二区三区| 欧美乱妇高清无乱码在线观看| 色综合天天综合高清网国产| 欧美国产亚洲日韩一区二区三区| 久久久亚洲精品国产| a级毛片免费全部播放| 精品久久久无码人妻| 香蕉乱码成人久久天堂爱免费| 亚洲一区中文字幕制服丝袜| 国产老妇伦国产熟女| 在线天天看片视频免费观看观看| 国产成人喷潮在线观看| 亚洲国产精品日韩| 好爽毛片一区二区三区四无码三飞| 国产三级久久久久精品三级| 高潮毛片无遮挡高清免费视频| 国产成人综合久久精品尤物| 真人一级毛片免费无码婬片AAAA片直播| 国产亚洲欧美综合在线区18| 久久婷婷五月综合色奶水99啪| 给我免费播放的视频在线观看| 一本乱码精品视频一区二区| 人C交ZO○ZOXX全过| 亚洲欧美日韩综合网导航| 国产欧洲日韩一区二区三区在线观看| 公天天吃我奶躁我的比视频| 天天躁日日躁狠狠操| 国产精品麻豆三级一区视频| 中文有码国产精品欧美激情| 成人a∨欧美大片| 久久久无码精品亚洲日韩链接| 国产高潮大叫在线观看| 我要看一级大黄毛片|